Can PVC plastic floor be paved on cement floor?
Can PVC plastic floor be paved on cement floor? Of course, it is possible, but the premise is that the ground must be free of water, sand, and no crust. It can only be paved on the cement floor if it is flat, so as to ensure that these requirements will not appear bulging, collapse, rework and waste materials, etc. The series of things happened, of course, the editor also mentioned before, whether to construct PVC plastic floor on tile or wooden floor, it is recommended to construct a layer of 2mm self-leveling on the ground, the effect will be better, and the service life will be better. longer. Of course, the following preparations and precautions should be made during the construction of PVC plastic floor;
1. Preparation of pvc floor construction materials and technologies
⑴All construction personnel, including management and operation personnel, must be familiar with the drawings of floor construction, clearly understand the construction plan, and know the detailed instructions for the use of materials.
(2) All materials must be strictly checked before entering the site to see if their specifications and dimensions meet the requirements. If the temperature is below 10°C, the material should be placed on the construction site for 24 hours of pretreatment before installation. The veneer material should be stored in a ventilated and dry place, and should be kept away from alkali, acid and other corrosive substances. When handling, pay attention to light loading and unloading to avoid damage.
2. pvc floor construction precautions
Do not lay the floor on the ground that is often high temperature, the temperature is too high or too low
Chipboards: often damp places
Outdoors: Before laying floors, bring them to room temperature for at least 24 hours.
Where to start: Use chalk to connect the midpoint of the wall, and the intersection is the center. This way, on the one hand, you don’t need to consider the laying of the floor tiles near the wall, on the other hand, it forms a good laying environment
layout:
⑴Before laying, check that each floor tile is not damaged
(2) If there is an arrow mark on the back of the floor tile, please make the arrow direction consistent.
(3) Starting from the center, lay the floor tiles as shown. If it is an adhesive floor tile, peel off the release paper on the back, carefully place the floor in place, and compact it hard; if it is a non-adhesive floor tile, pay attention to the illustrate.
⑷Do not move it once it is pasted (in fact, it cannot be moved without destroying the floor tile after it is pasted).
Cut:
⑴ first place a floor tile according to the original steps (do not tear the release paper to install).
(2) Place a floor tile near the corner of the wall.
(3) Mark the overlap with chalk, take out the floor tile and cut it with a utility knife.
⑷ Install according to the original steps.